LP designed, managed, and installed a full hummus production process into less than 1500 square feet that was capable of $80M in annual revenue. The work cell was compact yet robust. The various systems included two 75-gallon mixers, one dual wall heat exchanger, a four-lane filler, a metal detector, a labeling line, and all integrated piping that could perform a fully automated CIP in less than 3 hours. The design was from the ground up from drain locations, floor slope, and its orientation to a
LP worked alongside this client to address their municipality to adhere to their wastewater treatment requirements. We sourced and installed a complete wastewater pretreatment system to adjust pH and temperature before it went to the city. A future DAF solids removal system was accounted for in the first phase of the build.
QUICK LINKS
CONTACT US